Construction Equipment & Project Cargo Transport

Construction and project shipments are defined by individual units and site conditions, not only by total shipment weight. LogiPrime reviews equipment, building materials and non-standard cargo through its road, heavy-transport and port coordination services. Start with a piece-by-piece cargo list and the receiving site's constraints so the transport scope can be assessed.

Prepare a piece-by-piece equipment list

Record packed length, width, height and gross weight for every unit. Identify removable or separately packed components, and provide available drawings and lifting information for review. State whether the cargo can move under its own power or needs loading assistance. Avoid combining dissimilar machines into a single average dimension; equipment suitability depends on the individual pieces.

Connect transport planning with site access

Describe the approach to the site, gate restrictions, receiving hours and the planned unloading location. Identify who arranges cranes or other lifting equipment and whether an appointment is already agreed. The team needs to review the proposed access and handling before confirming vehicle selection. A preliminary quote is not a route survey or approval of a lifting operation.

Coordinate delivery sequence and port handover

For a port-to-site movement, identify the port, expected cargo availability and the party arranging release. Distinguish an expected arrival from goods that are ready for collection. Where several units must arrive in construction order, provide that sequence and any limits on site storage. Ask the quotation to separate transport, port handling, waiting and other requested activities.

Frequently asked questions

Can I choose a lowbed using only total weight?

Weight alone is insufficient. The team also needs dimensions, loading method, route and site conditions to review the appropriate equipment. Any proposed special-transport arrangements must be confirmed for the actual movement.

What if the site cannot receive all units together?

Send the required delivery order, receiving windows and available storage space. Request a review of staged deliveries and any intermediate handling, and make sure those stages are included in the agreed scope.

Services to consider

Heavy / Oversized Transport

Special road transport for Heavy / Oversized and project cargo with suitable trailer planning.

Ports & Terminals

Terminal-side coordination for containers, trucks, port handover, transfer and onward movement.

Road Freight

FTL, LTL, pallet, minivan and lorry road freight from Italy and Europe to Turkey, the Gulf and cross-border destinations.

Guides for your request

Construction Equipment & Project Cargo Transport | LogiPrime